Anyone here move from shore-based supply chain into a rig materials coordinator seat? I’ve cut PSV demurrage 18% at Port Fourchon by consolidating vendor loads in SAP and tightening backhaul windows, and I’m trying to figure out whether a 14/14 slot typically hinges on HUET/TWIC/RigPass or if demonstrated cost-per-barrel reductions carry more weight.